PROCESS:
Jan 08 - Apr 10
LOWER
MOLONGLO WATER QUALITY CONTROL CENTRE (LMWQCC) SECONDARY TREATMENT
FACILITY AUGMENTATION PROJECT CONSTRUCTION OF CIVIL AND STRUCTURAL
WORKS
ACTEWAGL
DISTRIBUTION
Contact: Ian Taylor - Ph: 02 6242 1436
Upgrade of the secondary treatment facilities including the
construction of three secondary clarifiers, RAS pumping stations,
anoxic tanks, level control structure, MCC building, pipelines,
methanol dosing facility, MLR pumping stations, Bioreactor
modifications, access roads and associated works.
Value $39 000 000
Project Manager: L Hegarty
Project Engineer: J Fielding
Site Engineers: Y Stavreas, W Coady
Supervisor: Z Simpson
Foremen: D McPherson, M Johnston
PROCESS:
Nov 07 - Feb 09
TIN CAN BAY, RAINBOW BEACH
AND COOLOOLA COVE SEWAGE TREATMENT PLANTS
COOLOOLA SHIRE COUNCIL
Contact: Ian Schiefelbein - Ph: 07 5481 0836
Construction, testing and commissioning of three sewage wastewater
treatment plants. The augmented treatment plants will use
Biological Nutrient Removal technology to reduce nitrogen
and phosphorus and include chemical dosing to meet requirements.
Works at the three plants will include the following: Inlet
works, oxidation ditch/bioreactor, two secondary clarifiers,
pump station, chlorine detention tank and chlorination system,
control/amenities building, hydraulic structures, chemical
storage and dosing facilities, pipework, earthworks, roads
and landscaping.
Value $18 000 000
Project Manager: J Davies
Project Engineer: JB Davies
Site Manager: J Board
ELECTRICAL:
Nov 07 - Aug 08
DESIGN
AND CONSTRUCTION OF A PIPE JACK TUNNEL BETWEEN CARLTON STS
AND THE NEW KOGARAH STS
ENERGY
AUSTRALIA
Contact: Bill Peters - Ph: 02 9394 6018
Design and construction of a 2400mm diameter by 120m long
pipe jack tunnel including fitout with stainless steel cable
support brackets. Construction of a deep cable pit, with stainless
steel access ladders and platforms, to provide access to the
tunnel. The tunnel is located beneath railway lines and roads
and has strict settlement and environmental monitoring requirements.
Value $4 700 000
Project Manager: M Fitzgerald
Supervisor: S Telese, A Patoka
MINING: Nov 07 - Apr 08
COTTER
TUNNEL NO 3 STABILISATION
ACTEWAGL
DISTRIBUTION
Contact: Sandy Sandanam - Ph: 02 6242 1426
The project consists of the stabilisation of an existing tunnel
by filling with concrete and cement grout to protect an existing
watermain that is within the tunnel. This requires inspection
and stabilisation of the 2.1m tunnel to allow the concrete
to be placed in stages followed by grouting to fill the remaining
voids. The work will be carried out in land managed by Parks,
Conservation and Land which is environmentally sensitive.
Value $850 000
Project Manager: M Fitzgerald
Site Manager: L Flack
PROCESS:
Oct 07 - Jun 08
MT
ISA TERMINAL RESERVOIR PUMP STATION
MOUNT
ISA WATER BOARD
Contact: Don McDonald - Ph: 07 4740 1000
Construction and commissioning of new reservoir pump station.
Works include construction of the pump station building including
the installations of pumps and motors, installation of transformers
and construction of transformer enclosure, installation of
prefabricated switch rooms, civil works including earthworks,
retaining walls, pavements and storm water, electrical works
and control system programming, installation of a pressure
vessel, pipe work, pipeline cut ins and connections, all other
work required for the construction of a fully operational
pump station.
Value $8 000 000
Project Manager: J Davies
Project Engineers: B Birch
Supervisor: N Derry
BRIDGES:
Oct 07 - Apr 08
GWH
UPGRADE HAZELBROOK - CONSTRUCTION OF SKYWALK BRIDGE &
SUSPENDED SLAB
ROADS
AND TRAFFIC AUTHORITY
Contact: Vasee Vaseeharan - Ph: 02 9794 4727
Supply and construction of a pedestrian footbridge and a suspended
slab for footpath relocation associated with the realignment
of the Great Western Highway at Hazelbrook in the Blue Mountains
west of Sydney. The Skywalk Bridge consists of reinforced
concrete pile foundations and abutments with a fabricated
steel frame superstructure topped by a hardwood timber deck.
The suspended slab is a reinforced concrete slab on piled
foundations.
Value $1 000 000
Project Manager: S Shrestha
Supervisor:
A Patoka
SEWERAGE:
Aug 07 - May 08
WOLLONGONG
STP RECYCLED WATER SYSTEM STAGE 2
SYDNEY WATER CORPORATION
Contact:
Mile Purdevski - Ph: 02 4225 2624
Installation of a recycled water system required to produce
tertiary treated effluent for the Port Kembla Coal Terminal,
Golf Club and Council. Works include design and construction
of electrical works, automation & SCADA, chlorine contact
tank, wet wells, flow meter pits, access road, switchroom,
effluent pumping station, in-line UV system, chemical dosing
systems, recycled water delivery pipelines, testing, pre-commissioning
and commissioning of the systems, and provision of training
to operators.
Value $3 500 000
Project Manager: M Fitzgerald
Supervisor: F Dimise
ELECTRICAL:
Apr 07 - Apr 08
BUND
WALLS TO POWER TRANSFORMERS
INTEGRAL ENERGY
Contact: Mark Donaldson - Ph: 02 9853 5090
Construction of bunded enclosure to live power transformers
in substation at Moorebank, Tyree, Springwood, Bonnyrigg,
Narellan and Glossodia.
Value $1 000 000
Project Manager: M Fitzgerald, S Shrestha
Supervisor: G Godefroy
ENVIRONMENTAL:
Mar 07 - May 08
LANDFILL
TAR SEEP DRAIN 2
SYDNEY
OLYMPIC PARK AUTHORITY
Contact: Grant Sutcliffe - Ph: 02 9714 7862
Design and construction of a subsurface tar collection drain.
Maintenance of the collection system, and removal and disposal
of tar for a five year period.
Value $1 200 000
Project Manager: M Fitzgerald
Supervisor: S Telese
BRIDGES: Feb 07 - Jun 08
REPLACEMENT OF RAILWAY OVERBRIDGE AT ERSKINEVILLE ROAD NEWTOWN
RAILCORP
Contact: Glen Xeureb - Ph: 02 9379 7192
Construction of a new single span overbridge and the demolition
and removal of the existing bridge. Works include traffic
control, worksite protection, piling, ground anchors, services
relocation, construction of abutments, demolition of existing
110 year old bridge, erection of steel girders, cross beams,
precast deck units, protection screens and barriers, construction
of concrete barriers and approach slabs, and road-works. The
majority of the works are carried out during weekend track
possessions whilst also maintaining vehicular and pedestrian
traffic.
Value $4 000 000
Project Manager: M Whelan
Superisor: S Telese
SEWERAGE:
Jan 07 - Jul 08
GOODNA
SEWERAGE PUMP STATION
IPSWICH CITY COUNCIL
Contact: Mano Manoharan - Ph: 07 3810 7845
Construction of a new 8.5 metre diameter pump well, dry valve
pit, flowmeter pit, electrical control building, standby generator,
odour control equipment, site filling and retaining wall construction,
site pipe-work, access roadway extension and ancillary works.
Value $9 000 000
Project Manager: J Davies
Project Engineer: B Birch
Supervisor: J Board
SEWERAGE:
Oct 06 - Jun 08
BELMONT
WASTE WATER TREATMENT WORKS STAGE 3
HUNTER
WATER CORPORATION
Contact: Brian Grady - Ph: 02 4979 9469
Stage 3 upgrade is to increase the nominal capacity of the
plant to 115,000EP. This work involves augmentation of the
aeration capacity and tankage, new improved grit removal facilities,
new aerobic digesters, a new clarifier, new sludge handling
facilities a major upgrade of the power and controls to the
plant and a number of other improvements.
Value $20 100 000
Project Manager: M Hanson
QA Engineer: E Miller
MINING:
Nov 05 - May 08
DENDROBIUM MINE SHAFTS 2 & 3
BHP BILLITON DENDROBIUM COAL MINE
Contact: Lou Lingurovski - Ph: 0409 999 251
The two shafts are to be bored at 4m and 5m diameter respectively
and to 270m deep. The shafts will be blind bored from the
surface and lined using remote methods. The shafts will be
completed prior to the underground tunnels reaching the location
of the shaft bottom. Design and construction of 12km access
road, bridges, precast yard, site compound, filtration/settling
dams, ventilation shaft collars and presinks. Construction
of site fencing, switchyard footings and foundations, ventilation
fan footings, and provision of water supply from Cordeaux
Dam. Construction of 174 composite liners, up to 5.5m diameter,
including welding of steel sections and casting of concrete
lining.
Value $24 000 000
Project Manager: B Hetherington, M Hanson
Supervisor: T Shirvington, Z Simpson, M Lacey
TELECOMMUNICATIONS:
Jun 96 - Ongoing
MOBILE PHONE BASE STATIONS
TOTAL COMMUNICATION INFRASTRUCTURE PTY LTD
NSW Contact: Rod Stanton - Ph: 02 9412 3344
Since June 1996 ongoing civil and building works associated
with the establishment of Vodafone, Telstra and Optus and
Hutchinson mobile phone base stations. Over three hundred
base stations completed throughout Sydney, ACT, regional NSW
and QLD.
Value $1 000 000 per year
Project Manager: J Davies
Supervisor:
J Board
|
|